Lilypad - 2024 Timeline

This is a detailed look at the development timeline in 2024.

2024

January

My offer was accepted and we began paperwork.

February

We closed the sale. I walked through the inspector's report and began triaging repairs.

March

We removed the ceilings and floors of the small rooms downstairs. There were minor signs of asbestos, so extra precaution was taken.

April

We replaced the furnace and water heater.

May

We repointed and capped the chimney.